Over 550 tons of reinforcing steel supplied for a 260,000 sq ft plant. Mat foundation thickness: 3 to 5.5 ft, with 8,000+ cubic yards of concrete. Precision fabrication and coordination ensured project strength and stability.
Foundations – thick mat slabs supporting heavy racks and machinery
Reinforcement – high‑tonnage bar mats, continuous bottom, top steel
Coordination – sequenced fabrication, tagged bundles, and just‑in‑time deliveries
Quality Control – bar placement checks, clear cover verification, and congestion review
Addison Construction Supply provided and fabricated over 550 tons of reinforcing steel for this 260,000-square-foot manufacturing plant, designed to support large-scale production of racks and machinery.
The project featured an extensive matt slab foundation ranging from3 to 5.5 feet thick, requiring more than8,000 cubic yards of concrete. Our team coordinated closely with the contractor to ensure precise fabrication, efficient delivery, and seamless installation.
Through careful planning and reliable supply chain execution, Addison ConstructionSupply played a key role in delivering the strength and stability essential for this state-of-the-art manufacturing facility.
Mark Andrews – President